Ready-mix concrete is ordered by the cubic yard, so this calculator leads with the yard number: enter the length, width and thickness of your pour and get the yards to order, waste allowance included. Bag counts are shown as a backup for small pours, and an optional price per yard turns the answer into a ready-mix cost. For round slabs and other shapes, use the concrete slab calculator; for a general-purpose tool, the concrete calculator — all three run the same verified math.

Ready-mix truck pouring concrete while the crew levels it — concrete yard calculator
Quick start:
Cubic yards to order (incl. waste)
— yd³
Cubic feet (incl. waste)
— ft³
80 lb bags (if mixing your own)
—
60 lb bags
—
40 lb bags
—
Estimated ready-mix cost
$—

Results update as you type. Estimates only — confirm final quantities before ordering.

The formula

Volume (ft³) = Length (ft) × Width (ft) × Thickness (in) ÷ 12
Cubic yards = ft³ ÷ 27  •  Bags = ft³ ÷ yield per bag

One cubic yard is 27 cubic feet — a cube 3 ft on each side. Spun out flat, one yard covers 162 ft² at 2 inches thick, 81 ft² at 4 inches, or 54 ft² at 6 inches, which is the quickest sanity check on any yard figure. The waste allowance (10% by default) is applied to the volume before the yardage and bag counts are worked out. Bag counts use the yields published in the QUIKRETE Concrete Mix data sheet: an 80 lb bag yields about 0.60 ft³, a 60 lb bag 0.45 ft³ and a 40 lb bag 0.30 ft³ — so one cubic yard is 45, 60 or 90 bags respectively. This is the same verified math as our concrete calculator, framed around the number a ready-mix dispatcher actually asks for.

Worked example

Example: a 20 ft × 10 ft driveway pour, 4 inches thick, 10% waste, ready-mix at $150 per yard.

The familiar 10 × 10 ft patio at 4 inches works out to 1.36 yd³ with the same waste allowance.

Reference chart

Cubic yards of concrete by slab size, including 10% waste
Slab size4 in thick6 in thick
8 × 8 ft0.87 yd³1.30 yd³
10 × 10 ft1.36 yd³2.04 yd³
10 × 20 ft2.72 yd³4.07 yd³
12 × 24 ft3.91 yd³5.87 yd³
20 × 20 ft5.43 yd³8.15 yd³
24 × 24 ft7.82 yd³11.73 yd³

Frequently asked questions

How many yards of concrete do I need for a 10x10 slab?

At 4 inches thick, a 10 x 10 ft slab holds 1.23 cubic yards before waste and 1.36 yd³ with the standard 10% waste allowance — order 1.5 yards if your supplier rounds to half yards. At 6 inches thick it is 2.04 yd³ with waste. In bags, the 4-inch slab is 62 x 80 lb bags.

How many yards of concrete are in a truck?

A standard ready-mix mixer truck carries 8–10 cubic yards (road weight limits often cap the practical load near 10). Smaller volumetric and mini-mixer trucks deliver roughly 1–4 yards and are aimed at exactly the small pours a full-size truck handles badly.

What is a short-load fee?

A surcharge suppliers add when an order falls below their minimum economical load — commonly under about 5 cubic yards. Supplier guides put the fee anywhere from about $50 to $200 depending on the company and how far under the minimum you are. It is always worth asking about before ordering 2–3 yards: sometimes ordering the minimum, or combining two small pours into one delivery, works out cheaper.

How many bags of concrete make a cubic yard?

At the published QUIKRETE yields, one cubic yard is 45 bags of 80 lb mix, 60 bags of 60 lb, or 90 bags of 40 lb — before waste. That is the practical dividing line between bags and a truck: above roughly one yard, ready-mix is usually cheaper and far less labor than mixing 45+ heavy bags.

Should I round my yard order up or down?

Always up. Suppliers batch in quarter- or half-yard steps, so round the calculator's figure up to the next step (2.72 yd³ becomes 2.75 or 3). Running short mid-pour means a second delivery, a cold joint and mismatched color; a small leftover costs a fraction of that. Keep the waste allowance at 10% for formed, level bases and raise it for hand-dug or uneven ones.

Related calculators

Sources & method: 27 ft³ = 1 yd³; bag yields from the QUIKRETE Concrete Mix No. 1101 technical data sheet (0.30 / 0.45 / 0.60 ft³ per 40 / 60 / 80 lb bag); mixer-truck capacity 8–10 yd³ and short-load practice (minimums commonly around 5 yd³, fees roughly $50–$200) per ready-mix supplier guides fetched October 2026. Yardage verified identical to this site's Concrete Calculator for the same inputs.